SES # | TOPICS | KEY DATES |
---|---|---|
1–2 | Manufacturing Systems Overview | |
3–4 | Probability | |
5 | Queueing Systems | Problem Set 1 Due |
6 | Queueing Systems (cont.) | |
7–8 | Inventory | |
9 | Optimization | Problem Set 2 Due |
10–11 | Optimization (cont.) | |
12 | Single-Part-Type Systems |
Problem Set 3 Due Midterm Exam Assigned |
13–14 | Single-Part-Type Systems (cont.) | |
15 | Single-Part-Type, Multiple-Stage Systems | Midterm Exam Due |
16 | Material Requirements Planning | |
17 | Multi-Stage Control and Scheduling | Problem Set 4 Due |
18 | Multi-Stage Control and Scheduling (cont.) | |
19–20 | Simulation | |
21 | Toyota Production System | Problem Set 5 Due |
22 | Quality / Quantity Interactions | |
23 | Analysis, Control, and Design of Stochastic Flow Systems with Limited Storage | Final Exam Assigned |
24 | The Control Point Policy | |
25 | Recycling Systems Engineering | Final Exam Due |